OUR SERVICES


Manpower Supply


"SAFETY, PRODUCTIVITY AND CLIENT SATISFACTION ARE THE MAIN GOALS OF OUR EMPLOYEES"
Why ASUT
ASU can provide manpower services for Oil and Gas facilities including:
PDO Permit holders & Applicant from all discipline
Engineers and Supervisors
Millwright Fitters
Pipe Fitters
Pipe Fabricators
Welders (CS, SS & Alloy)
Helpers
Grinders
Painters
Insulator
Hydraulic and Manual torquing technician
Riggers
Instrument Technicians
Electricians
Drivers
ASU Organization chart is consisting of multi-disciplines and highly component employees including mechanical, electrical, instrument and civil manpower.
They got their experience from RHIP (Rabab Harweel Integrated Project) and YKP (Yibal Khuff Project) the biggest two oil and gas projects in PDO history.
Our staffs and technicians are trained to work in high sour facilities under hard circumstances giving the best quality and taking into consideration that safety is first.
Purchasing


Why ASUT
ASU is charging 5% interest of the Capital price of any wanted tool or equipment taking into consideration that additional charges might be applied including transportation, taxes and commissions.
Delivery in ASU is fast due to the understanding of ASU members of the immature of time in project and for clients.
ASU management has experienced the criticality of the shortage of some equipment's, fitting, hoses and other consumables in Oil and Gas projects during construction and commissioning phases.
Accordingly, ASU is offering oil and gas contractors a rapid procurement procedure with standard prices and rates for any required equipment or material either from local or international market.
Construction Maintenance and Repairing Services


Why ASUT
ASU is charging 5% interest of the Capital price of any wanted tool or equipment taking into consideration that additional charges might be applied including transportation, taxes and commissions.
Delivery in ASU is fast due to the understanding of ASU members of the immature of time in project and for clients.
ASU Crew members are expert in Both rotating and static equipment as well as electrical and instrument complains.
These services include troubleshooting, alignment (laser, dial gauges), mechanical seal and bearing repair and replacement, catalyst loading, chemical and media filling, internals installation, preservation, filter cartridges replacement, suction strainer cleaning and leak testing.
ASU can support in commissioning activities including mechanical run test (MRT), Surge mapping, introducing of sour and sweet gas and different commissioning activities.
Oil Flushing Services


Flow Velocity
When flushing, it should be noted that a turbulent flow regime is necessvary in each section of the sub- system. The flow rate must therefore be calculated on the area giving the lowest Reynolds Number. Flushing will not be successful when flow is predominantly in the laminar region. For pipes when Reynolds Number is less than 2000 the flow is laminar and above 4000 it is turbulent, the intermediate values indicate transitional flow.
A newly constructed system or the one that is already in use requires flushing after breakdown, repair or time-based maintenance to-remove debris such as scales, rust, sand dirt by filtration of lubrication oil, Different methods & techniques are deployed for when and how to perform oil flushing, depending upon practical limitations and overall requirements of individual machines.
A well-planned and well-performed flushing activity offers considerable return on investment.
For the client who has credible maintenance records & demands no tolerance for untimely equipment failure.
A routine filtration and high velocity/hot oil flushing services are a critical part of preventive maintenance of all rotational equipment.


Why ASUT
ASU is charging 5% interest of the Capital price of any wanted tool or equipment taking into consideration that additional charges might be applied including transportation, taxes and commissions.
Delivery in ASU is fast due to the understanding of ASU members of the immature of time in project and for clients.
Temperature
Temperature is another important factor to consider during oil flushing operations, the temperature should be kept as high as it is practicable. The fluid temperature should not exceed °60C if it is to be reused; a higher temperature may be used if the oil is to be dumped.
It is important that any change in viscosity due to temperature is substituted into any calculations.
Chemical Cleaning


Why ASUT
RHIP and YKP projects with PDO were the sources of experience for our crews and supervisors in additional to years of experience in different gulf projects.
All ASU methods of statements are prepared by well-trained engineers and supervisors that are familiar with high quality and on the required time frame and good safety records.
Chemical cleaning is usually performed on process piping and equipment to remove deposits like scale, loose rust, waxes, paraffin, oils, dirt or any other foreign materials that could result in operating and maintenance problems.
A newly built or operational plant requires chemical cleaning to remove all the rust to enhance the operation and heat transfer and to avoid any further corrosion in the plant


Chemical Cleaning Pump & Filtration unit
Chemical cleaning can be either operational or post operational
Below are the various Methods of System Cleaning where we can help our client:
Application of Specialist Treatments
Foam pigging Techniques
Preservation and Passivation
Preventing Rust Formulation after Cleaning
Flushing and Blowing of Pipe-work
High Velocity Air or Inert Gas Blowing
Traditional Cleaning
Application of Acids, Surfactants and Heated Fluid Treatments
High Pressure Water Jetting
Internal Pipe-wall and Vessel cleaning using H.P. Water
Specialist Process Cleaning Techniques
High Speed Flushing
Steam blowing
The chemical cleaning parameter as follow:
Used to remove Grease/Oil, Mill-scale and Iron Oxides
Treatment Types vary upon Specification and Objectives
Treatment Components include
Surfactant: Used for Degreasing Pipe work Surface
Inhibitor: Used to Protect the System from Acid Attack
Hydrochloric or Fluoric Acid used for Cleaning/Dissolving Mill-scale and - ron
Further to that, the type & quantity of chemical(s), contact period with the system and overall procedure will be determined on case to case basis and will differ from one system to another.
The method of treatment chosen will be based on system metallurgy, design & operating conditions, extent of contamination & compatibility of chemicals, end users requirements, cost & HSE issues.
Nitrogen Services


Chemical Cleaning Pump & Filtration unit
A homogenous mixture of nitrogen/helium (N2/He) is pumped into the system. A Zone II, sound proof Nitrogen Pump is used to convert liquid nitrogen to gas & pump the gas into the system at various ranges of ow rates, pressure & temperatures. This testing method is considered as the nal & most stringent form of leak detection, as it establishes the integrityof the system being operationally ready by identifying & quantifying leaks with the help of a mass spectrometer. All anged, threaded connections of piping and equipment within the test envelope are subjected to test.
Since Nitrogen is a colorless, odorless, nontoxic, nonreactive and noncorrosive inert gas it can be used for a variety of reasons within oil & gas industry. During startups & shutdowns operations nitrogen is the most preferred gas, Itis used to perform various activities like drying with Nitrogen, Nitrogen purging and packing, Nitrogen blanketing Inerting & Nitrogen pressure testing. Our experienced engineering and sales team will work with you to design customized solution for all of your nitrogen service requirments


Why ASUT
ASU has emerged as one of the leading companies in this segment and maintains an impressive inventory of equipment such as pumps, tanks, vaporisers and other ancillary equipment.
All equipment are certified for both onshore and offshore operations.
ASU provides nitrogen/helium (N2/He) leak testing and other associated nitrogen services on pipeline and process system during pre- commission phase & shut down activty. These services are provided to onshore / offshore installatices.
Salient Features of N2/ He test
A newly constructed system or the one that is already in use requires flushing after breakdown, repair or time-based maintenance to-remove debris such as scales, rust, sand dirt by filtration of lubrication oil, Different methods & techniques are deployed for when and how to perform oil flushing, depending upon practical limitations and overall requirements of individual machines.
A well-planned and well-performed flushing activity offers considerable return on investment.
For the client who has credible maintenance records & demands no tolerance for untimely equipment failure.
A routine filtration and high velocity/hot oil flushing services are a critical part of preventive maintenance of all rotational equipment.
1% Helium 99% Nitrogen
Leaks Identified & Quantified Using a mass Spectrometer
Testing Done at Operating Pressure with an Inert Gas
Integral Part of the pre-Commissioning procedure
Enables a safe/Smooth Start up
Nitrogen Applications
Purging during shut down and maintenance
Simulation of live conditions / Test runs for safe startups
Leak testing of new process plant and system
Onsite nitrogen generation
Pipe freezing & plugging
Preservation & drying of pipelines during commissioning & work over
Removal of the oxygen (02) hydrocarbon, liquids and gasses content in the system to avoid explosive mixture.


Pipeline Cleaning Services
A crude oil, gas or water transportation pipeline can get blocked over a period of time as it flows various minerals and organic scales along with the product. If the debris or unnecessary components are left unchecked they will internal deposits & build up on the walls of the pipeline & will severely restrict the flow. These deposits can further be the most complex removal and mitigation factor.
A planned cleaning programme for pipelines can prevent the build-up of debris or deposits and thereby help ensure continuous product flow throughout.




Chemical Cleaning
Scrappers in conjunction with Chemical & Acids
Mechanical Cleaning
Utilizing Brushes & Magnets Scrappers




ASU
ASU Provides a wide range of scraping services during pre operational and post operational cleaning
Gel Cleaning
Utilizing Mechanic Scrappers Cross Linked Polymers Chemical Cleaners


Why ASUT
At ASU we have great knowledge in pre-commissioning and commissioning of various projects worldwide
gaining valuable experience in managing these projects.
We perform extensive research and lab trials to find the most effective chemical treatments for pipeline applications. Pipeline cleaning is necessary and required for numerous reasons including.
De-commissioning
Pre-inspection with in line intelligent tools
High corrosion rates due to deposits
Pre-cleaning for hydro testing
Loss of operating efficiency
A systematic approach is required to design a cleaning program that may include mechanical chemical and gel applications.
System analysis
Specify cleaning goal
Executo Clean
Deposit analysis
Evaluate deposits
Select and design cleaning system
Evaluate success
Deposit analysis
GET IN TOUCH
© 2025. ASUT all rights reserved.
